8414 Sabal Industrial Blvd, Tampa, FL 33619
Hurricane Strong. STH Strong
Mon – Fri 8:00AM – 5:00OM / Sat-Sun – Closed
Traditional field glazing can be slow and labor-intensive. Aldora’s RapidGlaze program revolutionizes this process by shifting the work from the job site to the factory. By delivering pre-glazed, factory-assembled units, this service allows you to shave weeks off your construction schedule. From the initial order to the final “dry-in,” RapidGlaze ensures higher quality control and faster installation for both standard and impact-rated storefront systems.
Instead of assembling frames and glass in the field, everything is put together in Aldora’s controlled facility. This ensures consistent quality and allows for the application of a robust wet seal system , providing building owners with peace of mind against future water intrusion.
Forget the manual labor usually required to unload deliveries. Aldora’s trucks come equipped with Moffett forklifts to efficiently offload pallets and stage materials directly in front of the necessary openings, streamlining the logistics at the site.
To further reduce the risk of damage and injury, an optional all-terrain glass lifter can be used. This operator-driven equipment carries the panel directly to the opening , positioning it perfectly for installation. Contact the Aldora technical team to see if your project’s size and weight specifications are a good fit for this option.
By skipping the traditional steps of receiving loose framing, fabricating on-site, and installing glass pane-by-pane, RapidGlaze dramatically shortens the critical path.